EDO Japan

 VETS Electrical has recently completed a tenant improvement project for Edo Japan in an existing 1116 square foot base building structure.  Through careful coordination with the General Contractor and all other sub trades, the project was completed within 80 days and on budget. The electrical scope for the food preparation area, kitchen, lavatories, point of sale, and dining area included:

  • Changes and additions to electrical distribution
  • Light fixtures, occupancy sensors, and switches
  • Emergency lighting fixtures
  • Receptacles, including furniture connections
  • Mechanical equipment wiring and interlocking
  • Kitchen equipment wiring
  • Telephone and communication system
  • Fire Suppression Interlocking